Peterborough City Hospital - Case Study
This carefully delivered project provided additional facilities for the hospital’s Urgent Treatment Centre through the supply and installation of bespoke modular units. Designed to integrate seamlessly with the existing hospital fabric, the new accommodation enhances capacity while maintaining a calm, functional environment suited to patient care. The installation required a highly coordinated operation, with the units craned over the main roof of the maternity hospital using a 450-tonne crane—an impressive logistical feat executed with precision. The result is a discreet yet impactful addition that balances technical complexity with thoughtful design and a focus on wellbeing.